The Sheetrock Work Crew Arrives! March 27th, 2008



This was the most amazing day in the construction of our home so far to date! Ten Mexican men arrived to hang the sheetrock. The pieces were 5/8" thick, and 8'x12' long. They arrived at 7am and pulled out at 5:30pm with the whole house fully sheetrocked! They were just like bees in a beehive in full action! They really knew what they were doing, with each one knowing what his job was.